#1 2023-12-24 11:13:25

AlvinRolli
Üye
Kayıtlı: 2023-12-23
Mesajlar: 60
Website

↑ „Größtes Projekt Seit dem Limes“

At the tip of July 2023, two young cattle egrets have been detected at Altmühlsee. Since 1994, water has been pumped from the Danube to the top of the canal utilizing pumps at the 5 locks on the southern ramp of the canal, from the place it flows downwards over another barrage into the Rothsee, where the water is saved and, if essential, in two other ways can also be delivered to the Regnitz. The Danube-Major transfer system contains a complete of three lakes, including the Altmühlsee with a ring dam and two dams with Brombach and Rothsee, which embody five dams resulting from their pre-dams, three hydroelectric power plants on the dams and the Hilpoltstein lock, the canal routes to the Altmühlsee and from there to Brombachsee in addition to 27 different weirs on watercourses, some of which have been expanded to accommodate greater water movement. This water then flows through a energy plant with three megawatts of electrical power at the Hilpoltstein lock with a fall height of 24.67 m. Within the years 1994-2013, a median of 97 million m³ of water have been transferred to the Rothsee yearly, the pure inflow of the small Roth was around 1995-2013 on average 27.9 million m³ of water was over The water sheath was transferred, after the end of the compensation, an average of 26.5 million m³ was transferred in 1999-2013 and 28.7 million m³ were given from the Brombachsee, whereby 11 million m³ of extra inflow is expected from the catchment area of the Brombach yearly.


Here is my web-site - Bellnet.de/suchen/regional/de/g/gunzenhausen.htm (e1ane2e.япошка82.рф)

Çevrimdışı

Forum alt kısmı